License # 248204

Lescure Logo

Project Details

John Muir Medical Center Joint Trench

Contractor: Pankow Special Projects

Part of the Phase III support project for the eventual new hospital tower in Phase IV, this underground piping job entailed all the toughest aspects of trenching.  Rock, ground water, deep trenches and a congested site all contributed to a difficult project.  Lescure Company ran the 10” & 6” Chilled Water, 4” Heating Hot Water Supply and Return, 4” Domestic Hot Water, 1-1/4” Domestic Hot Return, 6” Domestic Cold Water, 6” Fire Main, 4” Medical Vacuum, 3” O2, 2” N2 and 1-1/4” Medical Air, all in the common trench.